Institutional Data

Annual budgetary allocation (2025):

PERSONNEL COST

s/n Item Amount (N)
1. Salaries and wages 6,151,452,884.00
2. Regular Allowances 614,350,056.00
3. NHIS 307,018,958.00
4. Contributory Pension- Employer’s contribution 614,037,916.00
5. TOTAL PERSONNEL COST 7,686,859,814.00

 

OVERHEAD COST

s/n Item Amount (N)
1. Travel & Transport – General 49,689,674.00
2. Utilities- General 61,197,594.00
3. Materials & Supplies – General 72,864,761.00
4. Maintenance Services- General 56,214,954.00
5. Training – General 36,518,355.00
6. Fuel & Lubricants – General 30,645,889.00
7. Financial Charges – General 5,676,881.00
8. Refreshment & Meals 5,862,943.00
9. Publicity & Advertisements 3,691,103.00
10. Postages & Courier services 505,359.00
11. Subscription to professional bodies 1,835,889.00
12. Sporting activities 9,017,946.00
13. Direct Teaching & Laboratory cost 25,507,664.00
14. Annual Budget Expenses and Administration 9,914,454.00
TOTAL OVERHEAD 369,143,466.00

 

CAPITAL EXPENDITURE

s/n Item Amount (N)
1. Construction of 1km asphalted road with one side surface water drainage channels and walkway (From faculty of Education building to about 200m beyond the river). 638,794,375.00
2. Construction of 1No.3x3M Tripple cell box culverts at permanent site. 150,933,762.00
3. Purchase of 2NOS Vehicle for principal officers 204,219,164.00
4. Construction and furnishing of office Accommodation for the Directorate of Environmental Safety. 150,950,000.00
5. Connection of Electrical power supply to Fulafia printing press in the University Via 33KVA transmission line 70,000,000.00
TOTAL CAPITAL 1,214,897,301.00

 

SUMMARY OF ANNUAL BUDGETARY ALLOCATION (2025)

s/n Item Amount (N)
1. TOTAL PERSONNEL 7,686,859,814.00
2. TOTAL OVERHEAD 369,143,466.00
3. TOTAL RECURRENT 8,056,003,280.00
4. TOTAL CAPITAL 1,214,897,301.00
5. TOTAL ALLOCATION 9,270,900,581.00

 RESEARCH GRANT REVENUE FROM PREVIOUS YEAR (2024):

s/n Item Total (N)
1. Grants from Domestic Sources Nil
2. Grants from International Sources Nil
  Grand Total Nil

 TETFund TOTAL ALLOCATION FROM CURRENT YEAR (2025):

s/n Item Amount (N)
1. Physical Infrastructure/Programme Upgrade 1,300,000,000.00
2. Academic Staff Training & Development 240,000,000.00
3. ICT Support 150,000,000.00
4. Library Development 185,000,000.00
5. Conference Attendance 170,000,000.00
6. Institution Based Research 100,000,000.00
7. TETFund Project Maintenance 180,000,000.00
8. Entrepreneurship Centres 85,562,362.66
9. Career Centres/Unit 100,000,000.00
10. Publication of Journals 25,000,000.00
11. Manuscript Development 25,000,000.00
TOTAL TETFund ALLOCATION 2,560,562,362.66

 

TOTAL VALUE OF ENDOWMENT FUND AS AT END OF PREVIOUS YEAR (2024):

s/n Item Total (N)
1. Funds Donated Nil
2. Funds invested for long term Use Nil
Grand Total Nil

 

CURRENT TOTAL STUDENT’S POPULATION IN THE FOLLOWING CATEGORY (2025):

s/n Category Total Number
1. Undergraduates 22,029
2. Postgraduates 776
Grand Total 22,805

Note: The student’s information can be broken down to Department, Faculty, Colleges etc.

Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare